Mon–Fri 7 AM – 4 PM9400 Southridge Park Ct, Ste 100, OrlandoHablamos español(407) 217-5243
Aluminum · Gates

Aluminum gates

Walk gates, double drive gates, and custom estate gates made to your opening in 2–3 weeks. Gates are welded; hardware is sold separately.

Aluminum gates
Styles

Available styles

Photos are from the manufacturer or real installs.

Aluminum walk gates

Aluminum walk gates

Single gates to match any style and height.

Single
Double drive gates

Double drive gates

Paired gates for driveways and equipment.

Double
Estate gates

Estate gates

Arched, decorative entry gates made to your opening.

Custom2–3 weeks
Gate hardware

Gate hardware

Hinges, self-closing latches and gate hardware. Antebellum gates ship without hardware, so add it to your order.

HingesLatches
Buying guide

Ordering aluminum gates

Stock vs. custom

Walk and drive gates in standard sizes match our stocked styles. Custom and estate gates are made to your opening in 2–3 weeks.

Measure carefully

Send the opening width, height and whether the ground slopes. Wide or sloped openings may suit a cantilever gate.

Add hardware

Gates are welded and ship without hardware. Choose hinges and latches (self-closing for pools) when you order.

Questions

Common questions

How long do custom gates take?

Custom aluminum and estate gates take 2–3 weeks.

Do gates include hardware?

Antebellum gates ship without hardware. Add hinges and latches to your order.

Free quote

Request pricing

A material list, footage or a sketch all work. The office replies the same business day with contractor-direct pricing.

CallGet a quote